Saturday, July 6, 2013

Day 44: Tunnel Time

The unloading "tunnel" is at the bottom of the ship under all of the cargo holds and is where the cargo is released from gates at the bottom of the hold. From there it goes to a conveyer belt, up an elevator system, through the shuttle boom, and off the ship into the hopper at the steel plant. 

It's rather dusty down in the tunnel and it's safety first around here:


No comments:

Post a Comment